Rough clean during construction
Debris removal, sweeping, and bulk dust knockdown once the heavy trades finish, so the following trades work in a space that is safe and navigable.
Serving Boca Raton, Florida & surrounding areas
Mon–Fri 8am–6pm · Sat 9am–2pm
Post-Construction · Boca Raton
Rough, final, and touch-up phases handled properly, because drywall dust resettles twice and a handover inspection only looks at the last pass.
Construction dust settles three times. Cleaning once and calling it finished is why handover inspections fail.
Handover condition
Drywall dust does not settle once. It settles, gets disturbed by the next trade, and settles again, which is why a space cleaned too early looks untouched by the time the client walks it. The only approach that works is cleaning in phases tied to the construction schedule rather than to a single date at the end.
The other half of the job is residue rather than dust. Sticker adhesive on fixtures and appliances, protective film on glass and metal, paint flecks on tile, grout haze, compound splatter on frames, and the silicone smears along a freshly sealed edge. Each needs a specific method, and the wrong one scratches the finish you were hired to reveal.
We clean commercial fit-outs and new builds across Boca Raton: retail units around Town Center, medical and professional suites off Glades Road and Yamato Road, and office refits in the buildings around the Park at Broken Sound where a tenant is waiting on a date.
Timing is the part contractors care about most. We schedule against your punch list and your inspection date, because a final clean delivered two days late costs more than the clean itself.
Phase by phase
Debris removal, sweeping, and bulk dust knockdown once the heavy trades finish, so the following trades work in a space that is safe and navigable.
The full detail pass: all surfaces, fixtures, glass, and floors taken to presentation condition ahead of the client walkthrough.
The short return visit once remedial work is done, because every punch item creates its own small mess where it was fixed.
Protective film off glass and metal, stickers off fixtures and appliances, and adhesive residue lifted with the method the substrate can take.
Overspray flecks, joint compound splatter, and the cloudy film left on new tile, removed without marking the finish underneath.
Return grilles, diffusers, and light fittings cleared of construction dust so the system does not redistribute it through the building on day one.
Fitting your program
The rough clean belongs after the messy trades are finished and before the finish trades start. Cleaning before the drywall sanding is complete achieves nothing except a second invoice for the same work.
The final clean needs the site genuinely finished and, ideally, empty. Where trades are still working, we clean in zones and accept that any zone reopened to work will need revisiting, which we quote honestly rather than discovering on the day.
Touch-up is the phase most often left out of a budget and most often needed. Punch list remediation always leaves dust, handprints, and floor marks exactly where the client is about to look closely.
Air conditioning is a Boca Raton specific point worth planning for. Running the system before the ducts and returns are cleaned pushes construction dust across finished areas, which turns a completed final clean back into a partial one.
We look at your schedule and inspection date first, then place the rough, final, and touch-up phases where they will actually hold.
We identify the finishes on site and agree removal methods for film, adhesive, and haze before anything is applied to a new surface.
Each zone is worked from ceiling fittings down to floors, then closed off where possible so a completed area stays completed.
We walk the space with you before the client does, and book the touch-up visit for after remedial work rather than hoping none is needed.
How it is quoted
Post-construction cleaning commonly runs from about $0.25 to $0.70 per square foot for a final clean, with rough cleans quoted lower and full three-phase packages priced as a project. Condition at handover moves the price more than area does.
The variables that matter are how much residue is left on finished surfaces, how much glass is involved, and whether the site will be empty when we work. A site still running trades during the final clean costs more, and we would rather say that at quote stage than raise it afterwards.
Contractor questions
Most commercial projects need three: a rough clean after the heavy trades, a final clean before handover, and a touch-up after punch list work. Small refits sometimes combine the first two, but skipping the touch-up is the decision that most often causes a handover problem.
We can work in zones alongside trades, and for the rough phase that is normal. For a final clean an empty site produces a far better result, and any area reopened to work afterwards will need revisiting, which we price honestly up front.
Yes, film removal from glass and metal and adhesive residue from fixtures and appliances are part of the final clean. We match the removal method to the substrate, because the products that lift adhesive fastest are also the ones that mark a soft finish.
Yes, both are standard post-construction items and both need care rather than force. Grout haze responds to the correct cleaner and dwell time, and paint flecks are lifted mechanically in a way the finish beneath can tolerate.
Bulk construction waste and skip loading stay with the contractor, while we handle site dust, fine debris, packaging, and general clearance as part of the cleaning scope. We confirm that split in writing so nothing waits on an assumption.
Final cleans are usually booked against a known inspection date, so the earlier you give us the date the easier it is to protect. We can often accommodate short notice, though a compressed timeline on a large site means more crew rather than less scope.
Protect your handover date
Send us the project size, the finishes involved, and your handover date. We will quote the phases separately so you can schedule the rough, final, and touch-up work where each belongs.
Request a quote
Send the size, type of building, and how often you need service. We reply with a written scope and a price, and we will walk the site before anything is agreed.